Onslow iron 152km haul road

user icon green
CLIENT
Crushing Services International
clock icon green
DURATION
18 months
calendar icon green
YEAR
2026
location marker icon green
LOCATION
Onslow to Kens Bore
The Project

Scope of works

  • Topsoil stripping and site preparation
  • Foundation preparation for a stable road base
  • Embankment construction (cut-to-fill operations)
  • Sub-base and basecourse construction for durability and longevity
  • Ongoing maintenance grading to maintain road integrity

Project team

  • 2x construction supervisors
  • 15x roller, moxy and watercart operators
  • 3x final trim grader operators

Equipment

  • Wet hire: 2x CAT 150M final trim graders (GPS/UTS equipped)
  • Dry hire: 1x CAT 140M grader, 1x CAT 16-tonne padfoot roller, 1x 6-wheel watercart
Deliverables
  • 2x Construction Supervisors
  • 15x Roller, Moxy & Watercart Operators
  • 3x Final Trim Grader Operators
  • Wet Hire: 2x CAT 150M Final Trim Graders (GPS/UTS equipped)
  • Dry Hire: 1x CAT 140M Grader, 1x CAT 16-Ton Padfoot Roller, 1x 6-Wheel Watercart
Achieved Results

Reliable plant and skilled personnel have played a key role in keeping the project on track. With a strong focus on operational efficiency, safety, and high-quality execution, Dunamis Construction Group continues to contribute to the successful delivery of this large-scale mining infrastructure project.

Driven to Deliver with Precision and Certainty